One of Chicago’s biggest waterfront redevelopments is taking shape at the southern tip of Goose Island. Developer Onni Group has presented updated designs for Halsted Pointe, a multi-phase neighborhood of high-rise apartments, a hotel, retail and public space along the Chicago River. The new plans for Sub-Areas B, C and D are scheduled for review by the Chicago Plan Commission on November 19, 2026.
The most attention-grabbing feature? A proposed urban beach and a newly accessible riverfront with parks, plazas and walking paths that would open a former industrial property to the public.

Five Residential Towers, About 2,650 Apartments
The first phase, Sub-Area A, is already under construction and is outside the scope of this new presentation. It is planned as a 46-story residential tower with 464 apartments. The next two residential sub-areas, B and C, propose 2,186 additional apartments, bringing the projectwide residential total to about 2,650.
The newer residential buildings are planned in four towers, labeled B1, B2, C1 and C2. The proposal includes residential amenities, ground-floor commercial spaces and parking designed to remain largely below grade or hidden behind active façades. The presentation identifies 438 affordable apartments in Sub-Areas B and C, distributed through the project and provided access to the same amenities as market-rate residents.

Five Acres of Parks, a Beach and 1,360 Feet of Riverwalk
The city presentation specifies approximately 225,000 square feet of landscaped outdoor space and 1,360 feet of riverwalk with a naturalized river edge. Its design includes an urban beach, open common areas, dog runs, pickleball courts and a children’s playground.
The renderings show a sandy public gathering space at the southern tip of the island, an expansive riverfront lawn, outdoor seating and pedestrian routes that weave between the residential towers. The proposal would dramatically change how Chicagoans can experience this stretch of the North Branch of the Chicago River.




What Will the New Streets and Retail Look Like?
At street level, the plans aim for a walkable mixed-use district rather than a collection of isolated towers. Restaurants, retail storefronts, building lobbies, planted pedestrian corridors and public gathering areas would help activate the site.



A Hotel Is Planned for the Final Phase
Sub-Area D is planned as a hotel with a ground-floor lobby and restaurant or retail space. The broader development would bring more residents, hospitality uses and pedestrian traffic to Goose Island.
Construction Timeline: Through 2033
The presentation lists the following anticipated construction schedule. Dates are preliminary and depend on reviews, approvals and project conditions:
- Sub-Area A: April 2026–September 2028 (under construction)
- Sub-Area B: August 2027–December 2030
- Sub-Area C: Third/fourth quarter 2029–first/second quarter 2033
- Sub-Area D hotel: First quarter 2032–third quarter 2033



How the Towers Would Change the Skyline
The proposal also includes building elevations from all four directions. These detailed views show the tower proportions, façade treatments, upper floors and the relationship between high-rises, podiums and the river’s edge.




Traffic, Sustainability and Community Benefits
According to an October 2026 traffic study update included in the presentation, the development is projected to generate 7,070 daily primary trips, compared with 9,240 under the 2021 program. Onni also proposes a sustainability strategy that includes bird protection, native landscapes, naturalized river edges, aquatic habitat and electric-vehicle infrastructure.
The developer lists five acres of publicly accessible open space, community hiring and contracting goals, and approximately $28.1 million in specified financial contributions. These are proposed project commitments or estimates, not completed improvements.
What do you think of Halsted Pointe’s new plans? Would you visit a waterfront beach and riverwalk on Goose Island?
Source: Chicago Plan Commission presentation, November 19, 2026 (Onni Group / SCB). Renderings are proposed designs, not completed construction.